On 16 October 2018, the Agency for the Cooperation of Energy Regulators (ACER) issued a decision according to which the Polish GSA Platform will be used for capacity booking at the "Mallnow" and "GCP GAZ-SYSTEM/ONTRAS" interconnection points by the German transmission grid operators GASCADE and ONTRAS as well as the Polish transmission system operator GAZ-SYSTEM. More