The clients of GAZ-SYSTEM used the new allocation capacity auction platform.
On
July 21st 2014, GAZ-SYSTEM S.A. successfully conducted first auctions
of the monthly products on the new capacity allocation platform called
GSA. Capacity was allocated in the Point of the Interconnection between
Transit Gas Pipeline System Yamal–Europe and Polish transmission system
(as a bundled product), and also in IP Lasów on the Polish-German
border.
Results of auction are available
here.